Project Details

  • Construction Date

    2015/2016

  • Location

    Pomorie

  • Surface Area

    50 000 m2

  • Construction Investor

    Sunse Aquapark

  • Categories:

    ,

Project Description

Sunset aquapark, a major project near Pomorie required of us killing time while surgical precision craftsmanship of the foundations for slides, technical rooms and pools.

The implementation of the facade of the building with such complexity allows us to define it as one of our masterpieces, and the challenge to produce about 5,000 m2 concrete paths with granite flooring for three months will remember forever.

Was filled irrigation system for irrigation of vast green areas of the park.

Despite the efforts of the famous Pomorie mud to stop us, aqua park was delivered on time and work for the 2016 season.

 

Activities performed:

  • Concrete foundations for slides;
  • Pools and technical facilities;
  • Concrete pavements and paths;
  • Concrete fence;
  • Facade main building;
  • Granite flooring;
  • Irrigation installation